How Door Installation Works
Seven steps from the first call to the last click of the latch, so you always know what comes next.

Seven steps
From call to walk-through
- 1Talk and lookA short call or visit. We listen to how the doors are used and look at the opening, the sun and the weather.
- 2MeasureWidth, height, depth, square, plumb and level, written down at several points.
- 3DesignStyle, material, glass, hardware and color, drawn on your own opening.
- 4EstimateA written plan with the price and the schedule in plain language.
- 5Make and prepareYour door and frame are made or ordered, finished and checked.
- 6InstallOld door out, sill flashed, new door hung plumb, sealed and adjusted.
- 7Walk throughWe show you the hardware, the care notes and how to adjust the door.
Before the crew arrives
A short checklist
- Clear the area inside and outside the door
- Move rugs and furniture near the opening
- Tell us about pets, children and parking
- Have photos or measurements ready if you have them
- Decide who will be home at the start and the end
Questions
Straight answers
How long does it take from first call to install?
A standard door can be installed within a few days of ordering, while custom doors take longer because they are made to order. We give you a schedule with the estimate.
Do I have to be home?
An adult should be present at the start and the end. We can plan the rest of the day around you.
Ready when you are
Ready when your door is.
Pick up the phone or send the short form below. Either way a real person replies with a clear next step.